When would you need one?

If you are wanting LIM type information about a property, but are not in a position to wait we will provide a LIS. Whilst we do not suggest that thus will replace a LIM, in many cases the LIS maybe an alternative to the consumer as there are advantages over a ‘normal’ LIM, most notably timing (48 hours) and the benefits of a site visit.

When is one required?

In the event that alterations or improvements have been carried out and in circumstances where a building PERMIT (prior 1st July 1992) should have been issued.

When is one required?

In the event where Council records show a building permit / consent was issued for works carried out prior to 1st July 1992 but not ever finalized or signed off.

When is one required?

In the event that alterations or improvements have been carried out and in circumstances where a building CONSENT (post 1st July 1992) should have been issued.

  • Maintenance Inspections
  • Structural Surveys
  • Commercial Building Surveys
  • Completion of Tenancy Reports
  • Compliance Certifications
  • Full report covering all structural components, list of maintenance recommendations, approximate costings for any work required and photographs.
  • Reports available within 1 - 2 working days
  • IEP- Earthquake risk Status

 

House Inspections Leaks Identified

 

  • Moisture testing without disruption to substrate/surfaces
  • Remove cladding/Lining
  • and report on status
  • Thermal Imaging Infared camera used to identify variations in surface temperatureand dampness

 

House Inspections Reports

 

  • LIS Reports ( Land Information Summary's) >> Click Here for More
  • Safe and Sanitary Reports >> Click Here for More
  • Final Closure Reports >> Click Here for More
  • Certificate of Acceptance Applications >> Click Here for More
  • Building Consent Preparation and Lodgement
Top
  • Questions? Concerns? Get in touch- We will answer your questions: 0800 00 73 76altCONTACT US!